The Street is a world class youth and community facility for families. It is a base for voluntary, community and youth services so that people can get the help and support they need. Each week hundreds of people will visit The Street for training, sports, work, art or simply a place to socialise.

 

DSC_0616

Playing Our Part

EMCE were contracted to carry out the full Mechanical and Electrical installation to the project. A design brief was provided by the consultants with final design down to EMCE. The project was required to meet and overall Energy Performance Rating Assessment rating of ‘B’. This required detailed attention to the Mechanical and Electrical services installed to the building. To assist in achieving the required EPC rating REHAU under floor heating and LED lighting with smart lighting control were installed to the building. All Mechanical and Electrical services to the building were metered and monitored by the central BMS system.

A biometric security system was installed to control access to all areas of the building.

The M&E installation was completed in 36 weeks.

Scroll to Top